Our mill sketch gives the steel blank plenty of room, provided it travels without fingers or a gripper body; I need the complete assembly checked before this FR5 position becomes a purchase decision.
I've got an adapter dispute where the connection points into the fixture, so don't stop at adding the metal body. Get the actual connection direction and lines in there too. A blank floating through a doorway is the easy version of the job.
Can the machine contact identify the exact door arrangement fitted? We had a borrowed model with the right machine name and the wrong handle. It was a surprisingly convincing distraction.
Please get the setter into this before fixing the stand position. I'm less worried about a beautiful narrow route than the person who still has to take the fixture out when the job changes.
Nadia, yes. We once had clearance for the installed fixture but no way to bring its lifting aid alongside. That got found before installation, thankfully. The first review had treated maintenance as somebody being able to stand nearby.
Amy, show the setter the actual removal task and where the removed fixture goes. They may spot a problem without anyone needing to build a stand to discover it.
Jamie, maybe, but I'd keep manual unloading as a priced option too. Amy shouldn't have to redesign the whole bay just because one robot position has already acquired a drawing number.