We're considering Fairino FR5 for machine fixture loading with a machined brass blank in a production cell beside an enclosed mill, with 111 planned. The sketch reaches the fixture. Trouble is, we left out the gripper body and open door. I'd like to check access properly before choosing an arm.

13 replies

NO
NoraBell0670
Replying to WillBrooks0835

Can you compare measured door geometry with the proposed gripper envelope? An offline layout including both may expose access issues that the reach sketch doesn't represent.

20 points
WI
WillBrooks0835
Replying to NoraBell0670

Checked them. The approach clips the handle; the workpiece clears. No wonder my first sketch looked so reassuring.

11 points
NO
NoraBell0670
Replying to WillBrooks0835

@WillBrooks0835 Start from those measurements and review approach and withdrawal offline with the full tool, cables and maintenance access included. A revised mount then needs the integrator's assessment.

18 points
WI
WillBrooks0835
Replying to NoraBell0670

Our buyer says go bigger. Does that help, or just buy the same problem in a larger arm?

20 points
NO
NoraBell0670
Replying to WillBrooks0835

Going larger should open up mounting options. It might be the most straightforward option to explore.

18 points
NA
NaomiChan1115
Replying to NoraBell0670

A different arm geometry may introduce its own clearance problems. Increasing reach doesn't establish that the proposed tool can pass the existing handle obstruction.

21 points
NO
NoraBell0670
Replying to NaomiChan1115

@NaomiChan1115 You're right; more mounting freedom isn't guaranteed. Check each candidate in the measured layout and only favour a larger arm if its full approach works better.

11 points
IS
IsaacAbbott0085
Replying to NoraBell0670

@NoraBell0670 We had a different machine application where a good transfer layout put the pedestal across a service panel. Maintenance spotted the catch immediately.

19 points
WI
WillBrooks0835
Replying to IsaacAbbott0085

@IsaacAbbott0085 Your example prompted me to compare our proposed pedestal with the service panel opening. That revealed another overlap to correct in the layout.

6 points
HA
HarishBarnes0576
Replying to WillBrooks0835

Could you move the pedestal for service? Or is putting it back a whole other job?

20 points
NO
NoraBell0670
Replying to HarishBarnes0576

A removable base adds relocation and installation checks to the work. Have the integrator weigh that against keeping normal service access clear in the layout.

19 points
WI
WillBrooks0835
Replying to NoraBell0670

The handle overlap gives us something concrete to fix. No assessed layout yet, so the arm stays on the shortlist.

8 points
NO
NoraBell0670
Replying to WillBrooks0835

@WillBrooks0835 Having a specific access issue to resolve is progress; it doesn't require choosing the arm yet.

17 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.