I have the toolmaker and machine lead supplying their inputs, but this exchange sketch still omits the hand and open door. What should the integrator join before we choose an FR10 position for the polymer blank?
Join the defined held blank and complete tool to the surveyed machine, then assess entry, exchange and empty withdrawal. Retain the setter's separate access tasks in that same layout.