Fixture assumptions shouldn't live only in someone's head (Fairino FR5)

RachelBell0696 · 19 May 2026, 10:00 UTC

Reply to discussion
RA
RachelBell0696
I'm preparing our inspection-cycle coordination handover for Fairino FR5 in a training inspection station preparing a handover, using a machined bracket. The notes are mostly pendant screenshots without revision details. They show the main routine but omit subprograms, fixture assumptions and expected ordinary PLC signals. I need a usable structure while the original integrator is still available.

3 replies

CA
CallumBennett0708
Replying to RachelBell0696

Can you match the installed revision to a controlled export first? That tells you which program the handover needs to describe.

7 points
RA
RachelBell0696
Replying to CallumBennett0708

Our installed revision matches a controlled export, but I've identified screenshots from an older program copy. Their different routine names explain the mismatch in our notes.

13 points
CA
CallumBennett0708
Replying to RachelBell0696

@RachelBell0696 Build a call map from that export and list external dependencies with their owners. That should give maintenance what it needs to follow the program.

7 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.