Which complete-tool details are missing from our FR10 housing quotes?

DanielBell0652 · 13 Dec 2025, 04:29 UTC

Closed
DA
DanielBell0652
Two quotes justify the FR10 tool from housing mass. Neither includes the adapter or fittings in its load information. Long fingers shown, no agreed grip depth. What exactly should come back before purchasing decides?

18 replies

DA
DavidAli0258
Replying to DanielBell0652

Ask for the complete proposed assembly, with total mass and load geometry including the held housing at its intended grip position. The supplier should assess that configuration for your required movement, not just compare the housing weight with a headline capacity.

15 points
DA
DanielBell0652
Replying to DavidAli0258

One quote lists the adapter as customer supplied. No drawing reference. That makes its claimed suitability fairly ambitious.

18 points
EM
EmmaBrown0898
Replying to DanielBell0652

Does your workshop already have the adapter they mean, Daniel? Customer supplied could identify a real component, but the quotation needs to say which one.

13 points
LI
LinBennett0705
Replying to DanielBell0652

And who selected the finger length? Is it tied to a measured access requirement?

14 points
DA
DanielBell0652
Replying to LinBennett0705

Emma, no adapter selected. Lin, length came from reaching past the nest wall. The supplier has the wall height but not the complete loading route.

10 points
ZA
ZaraBaker0482
Replying to DanielBell0652

Get that missing route into the request too, including release and withdrawal, so the tool choice is reviewed against what it actually has to do. Loading the part and getting the tool out are both part of the job.

22 points
DA
DavidAli0258
Replying to ZaraBaker0482

Zara, yes, though I would not wait for a final route before asking them to identify the assembly assumptions. Daniel needs to know what their existing price actually buys.

4 points
ZA
ZaraBaker0482
Replying to DavidAli0258

Agreed. Send the scope questions now. I meant the complete movement must be part of the suitability decision, not that purchasing should sit quietly until everyone finishes drawing.

23 points
EM
EmmaBrown0898
Replying to DanielBell0652

A separate option price for the adapter could be useful, provided responsibility for confirming the combined assembly stays explicit. Otherwise two suppliers can each deliver their own perfectly adequate half.

7 points
LI
LinBennett0705
Replying to DanielBell0652

Is the housing orientation during transfer agreed?

16 points
DA
DanielBell0652
Replying to LinBennett0705

Pickup and destination orientations are agreed. The intermediate route is not. I've sent both suppliers the same nest drawing and required endpoints.

14 points
DA
DavidAli0258
Replying to DanielBell0652

Include the housing drawing and proposed grip depth with those endpoints. A picture of the nest alone will not tell them where the held load sits relative to their adapter.

20 points
DA
DanielBell0652
Replying to DavidAli0258

Housing drawing supplied. Grip depth remains their proposal to justify, not a dimension I am going to guess for them.

8 points
LI
LinBennett0705
Replying to DanielBell0652

Reasonable. Keep the two proposed depths visible in the comparison if they differ.

4 points
EM
EmmaBrown0898
Replying to DanielBell0652

Daniel, do the quotes include the same fittings? A bare gripper drawing can make the shorter assembly look much more compact than the delivered tool.

15 points
DA
DanielBell0652
Replying to EmmaBrown0898

No. One drawing has fittings, the other says pneumatic accessories excluded. Asked for the actual arrangement. Still no complete comparable offer.

4 points
ZA
ZaraBaker0482
Replying to DanielBell0652

Who from maintenance will review replacing those fingers and fittings once the assembly is defined? A workable transfer can still leave an awkward service job around the nest.

11 points
DA
DavidAli0258
Replying to DanielBell0652

And ask each supplier to name what remains unassessed in its revised offer. An honest provisional price is usable; a complete-looking price assembled from different assumptions is a pain.

12 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .