Why does our UR5e monitor count a completion it already saved?

BrunoBarnes0539 · 7 Jan 2026, 09:23 UTC

Closed
BR
BrunoBarnes0539
Our bracket completion remains high during a disconnect. On reconnect the monitor adds another accepted row, though its previous row is still saved. Which identity should the developers reconcile before altering the retained signal?

2 replies

RE
ReeceBrooks0819
Replying to BrunoBarnes0539

The actual attempt identity across both systems, including what survives either restart. Keep a known duplicate distinct from an observation whose owner cannot be established; neither needs an automatic resend.

11 points
BR
BrunoBarnes0539
Replying to ReeceBrooks0819

Application has an attempt reference. Exposed PLC data has only the reused job name and flag. Controls is checking whether an underlying attempt history survives; the monitor draft holds the unmatched observation separately.

17 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .