Another UR5e bracket review: clamped alignment tick, released failure, then correction. Can I compare those without measurement instructions?
I'd find the drawing revision, measurement method and restraint condition for each check first. Those ticks may describe different features, and the correction step can leave the accepted sample looking much more informative than it is. Keep the stages separate until inspection can connect them.