Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.
What should count as dimensional acceptance after welding?
AdaAli0216 · 12 Aug 2026, 17:42 UTC
I'm reviewing historical records for our planned preparing robotic welding of gusseted brackets with Universal Robots UR5e and a gusseted steel support bracket weldment in a welded-bracket fabrication workshop. The notes describe alignment under restraint but dimensions outside the drawing requirement after release. I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved
3 replies
Add to the discussion
Welcome to Application Robot
By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.