Our proposed use for Fairino FR10 is machine fixture unloading with a rectangular polymer blank in a supervised machine tending bay, with 179 planned.
The reach sketch suggests the fixture is accessible, but it includes neither the gripper body nor the open machine door.
I need a fuller access check to inform our choice of arm.
Use that measured layout to review the complete approach and retreat offline. Include the tool, cables and service access, then ask the integrator to assess a revised mounting arrangement.
@SamAli0246 Yes, I made that sound more certain than it's. Compare candidate geometry in the measured layout; a larger arm is only useful if the complete approach improves.
@MeiBennett0777 We had a different machine application where a good transfer layout put the pedestal across a service panel. Maintenance spotted the catch immediately