The FR5 concept reaches our polymer blank, but the drawing leaves out the open mill door and the gripper body. We need an access check, not another reach circle. What is the minimum useful drawing to request?
One review I saw had an accurate machine outline and the door drawn in the wrong position. Request the surveyed open door, fixture, complete held tool and proposed base together. Include entry, loaded withdrawal and empty return, with setter access still visible. A blank at the pickup point is only one pose.