Our FR5 bracket proposal uses old aligned-in-fixture notes, failed released dimensions and a final pass after correction. What should we separate before the new fixture inherits that unexplained operation?
I'd have the historical route drawn as separate stages with those gaps visible, because an operator learning the new process could otherwise be told that a fixture alignment tick means the finished bracket meets the drawing.
Quality is looking for the released-check method. I've kept incoming fit-up, restrained location, released check and post-correction acceptance separate in the review index