Our ready signal agrees with two incompatible drawings

TheoBell0671 · 29 Jul 2025, 02:49 UTC

Closed
TH
TheoBell0671
I've put the machine and FR5 interface drawings side by side. Ready means the machine received our request on one, and that the loading area is available on the other. Both suppliers say their drawing is correct. What sequence should we walk through together before either side starts programming?

0 replies

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .