Maintenance electrician moving into robot support

TheoBell0671

Theo Bell

TB
AustraliaJoined 26 Jan 202595 posts

About

Maintenance electrician moving into robot support. Currently exploring small-batch automation and grippers and tooling. Working around remote technical support; planning a 14-week trial before making a decision.

Small-batch automationGrippers and tooling

Conversations

T

Fairino FR5: Our planned batch is 119; the demonstration covered one finish

TheoBell0671 · 5 points · Applications & integration · 2 Sept 2026
0replies
T

The tray locator helped, then a replacement brought back a miss - fixture-to-tray transfer

TheoBell0671 · 17 points · Applications & integration · 27 Aug 2026
15replies
M

An empty pocket leaves our operators guessing - tray transfer

MinaCarter1033 · 27 points · Programming & support · 14 Aug 2026
9replies
H

softer collar pads are proposed before we've agreed what counts as a mark

HenryBarnes0525 · 34 points · Buying advice · 30 Jul 2026
13replies
T

Our FR10 spacer sequence has receipt dressed up as availability

TheoBell0671 · 20 points · Programming & support · 2 Jul 2026
20replies
A

Why do both FR5 tooling offers weigh everything except the tool?

AaronAdams0088 · 17 points · Buying advice · 28 Jun 2026
8replies
C

Why does reconnect give our FR10 coupon another completion?

CallumBennett0708 · 35 points · Applications & integration · 28 Jun 2026
18replies
J

Holding a machined aluminum puck less squarely than before (Universal Robots UR5e, tray loading)

JonasArcher0372 · 21 points · General robotics · 25 May 2026
18replies
D

A small production workshop: Choosing an arm when the demos don't match

DanielBrown0913 · 11 points · Buying advice · 23 May 2026
14replies
A

Our carton has a preferred support direction. The pattern rotates it. (Universal Robots UR5e)

AnnaCarter1025 · 6 points · Applications & integration · 20 May 2026
8replies
S

Getting consistent inspection evidence before commissioning

SaraBrown0896 · 3 points · Programming & support · 14 May 2026
21replies
R

Does a warehouse reference mean the robot is there? (Fairino FR10, placing housings in trays)

ReeceAbbott0036 · 13 points · Buying robots from China · 29 Apr 2026
16replies
H

Why is our accepted faceplate still called accepted after coming back with a new line?

HenryArcher0351 · 29 points · Programming & support · 7 Apr 2026
18replies
T

Our FR10 lathe diagram calls receipt and loading availability ready

TheoBell0671 · 3 points · Programming & support · 5 Apr 2026
12replies
J

fr10 vacuum sample omits our taped seam

JasperAli0203 · 28 points · Applications & integration · 25 Mar 2026
14replies
M

Why does our FR10 torch only fit when it is drawn as a line?

MeiBennett0777 · 17 points · Applications & integration · 20 Mar 2026
4replies
A

FR10 bracket plan with an imaginary empty correction bench

AnikaBell0682 · 17 points · Applications & integration · 5 Feb 2026
6replies
T

Our FR10 answers the visitor's laptop and ignores ours

TheoBell0671 · 17 points · Fairino robots · 4 Feb 2026
2replies
L

Can the UR5e torch leave the inside seam without passing through our clamp?

LeahBarnes0582 · 30 points · Applications & integration · 12 Jan 2026
21replies
J

Will our missing UR5e spare cable ever get a parcel of its own?

JaneBell0684 · 34 points · Buying advice · 6 Jan 2026
8replies