UR5e sleeve handover teaches start and leaves every interruption with me

OmarCarter1013 · 8 Jul 2026, 06:43 UTC

Reply to discussion
OM
OmarCarter1013
The operators need the missing decisions, not another lecture about confidence. My sleeve-transfer handover covers a clean run, while an empty pocket or interruption means a call to me. How do I make the awkward cases part of the actual job definition?

2 replies

HA
HazelChan1093
Replying to OmarCarter1013

Sit with a covering operator and take one empty-pocket case first. What information tells them whether it is planned, a missing sleeve or uncertain work after a stop? If the system doesn't retain that evidence, the controls owner needs to define the response before you can teach it. You can't hand over a decision whose answer only exists in your memory.

18points
OM
OmarCarter1013
Replying to HazelChan1093

The walkthrough found no distinction between a planned unused pocket and one whose transfer was interrupted. Controls owns the retained-context and recovery design; the shift lead owns the interim call route. I've kept the handover supervised while those decisions are unfinished.

9points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.