What should we measure before choosing Fairino FR5? (finished blank removal)

NoahAllen0281 · 14 Aug 2026, 13:47 UTC

Reply to discussion
NO
NoahAllen0281
Our proposed use for Fairino FR5 is finished blank removal with a rectangular polymer blank in a supervised machine tending bay, with 223 planned. The reach sketch suggests the fixture is accessible, but it includes neither the gripper body nor the open machine door. I need a fuller access check to inform our choice of arm

19 replies

CA
CallumBrown0882
Replying to NoahAllen0281

@NoahAllen0281 Got measured outlines for the opening and gripper? An offline layout might catch what the reach circle misses.

5 points
NO
NoahAllen0281
Replying to CallumBrown0882

Checked them. The approach clips the handle; the workpiece clears. No wonder my first sketch looked so reassuring

3 points
CA
CallumBrown0882
Replying to NoahAllen0281

@NoahAllen0281 Use that measured layout to review the complete approach and retreat offline. Include the tool, cables and service access, then ask the integrator to assess a revised mounting arrangement.

16 points
NO
NoahAllen0281
Replying to CallumBrown0882

The buyer has suggested choosing a larger arm. I'm unsure whether that would address the access issue or simply increase our purchase while leaving the obstruction unresolved

21 points
CA
CallumBrown0882
Replying to NoahAllen0281

@NoahAllen0281 A larger arm should give you more mounting freedom, so that could be the easiest route to investigate.

1 points
HA
HazelAli0223
Replying to CallumBrown0882

Bigger could bring another obstruction. Extra reach won't shrink the gripper past that handle.

5 points
CA
CallumBrown0882
Replying to HazelAli0223

Yes, I made that sound more certain than it's. Compare candidate geometry in the measured layout; a larger arm is only useful if the complete approach improves.

7 points
FE
FelixBrooks0806
Replying to CallumBrown0882

@CallumBrown0882 We had a different machine application where a good transfer layout put the pedestal across a service panel. Maintenance spotted the catch immediately.

15 points
NO
NoahAllen0281
Replying to FelixBrooks0806

Checked ours. The suggested pedestal overlaps a panel opening too. More red pen for the drawing

3 points
HA
HazelBrooks0832
Replying to NoahAllen0281

Would making the pedestal removable address service access, or would restoring its position introduce a further setup requirement to evaluate?

24 points
CA
CallumBrown0882
Replying to HazelBrooks0832

@HazelBrooks0832 A removable base adds relocation and installation checks to the work. Have the integrator weigh that against keeping normal service access clear in the layout.

2 points
NO
NoahAllen0281
Replying to CallumBrown0882

Our fixture needs straight entry. Put that constraint in before moving the base around?

20 points
CA
CallumBrown0882
Replying to NoahAllen0281

Yes. Include the required entry direction and withdrawal conditions, not just an end pose. A reachable point can still have no usable approach with the proposed tool.

6 points
FE
FelixBrooks0806
Replying to CallumBrown0882

@CallumBrown0882 For our machine, withdrawal with a held workpiece needed a different route from entry. The empty-tool model made the clearance look much better than it was.

4 points
NO
NoahAllen0281
Replying to FelixBrooks0806

I'll include empty and loaded tool outlines. We also need to agree who owns the machine signals; that part of the quote is vague

2 points
HA
HazelAli0223
Replying to NoahAllen0281

Name whoever owns the interface work. Otherwise the robot and machine contacts can both think the other has covered fixture state and permission to enter.

19 points
HA
HazelBrooks0832
Replying to HazelAli0223

@HazelAli0223 Machine ready means safe to enter, doesn't it? The sales wording makes them sound alike.

11 points
CA
CallumBrown0882
Replying to HazelBrooks0832

@HazelBrooks0832 A process-ready signal isn't automatically a safety function. The qualified cell assessor needs to define protective measures and restart requirements separately from the production sequence.

3 points
NO
NoahAllen0281
Replying to CallumBrown0882

Can we trial representative fixture geometry while the interface scope is still open? I'd like to move the access question along

8 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.