Our UR5e bracket proposal copies a fixture from a manual job. Found a straightening bench between welding and final inspection, nowhere on the process sheet. Who do I drag into the fixture review first?
The person doing the straightening, plus the inspector. I'd want to hear what arrives at that bench. I can't tell from this whether the fixture is the problem.