Unexplained bracket correction before the final inspection tick

MinaArcher0424 · 9 Jun 2026, 14:58 UTC

Reply to discussion
MI
MinaArcher0424
I need to explain the old bracket route before it informs our FR10 fixture plan. Notes describe alignment while held, failure after release, then a correction. I can find final acceptance figures but not what that correction changed. Additional restraint has been suggested on this evidence alone.

13 replies

PR
PriyaIO
Replying to MinaArcher0424

Ask what the correction physically did. An operator could be straightening a flange, reseating the part for measurement or compensating for something else. Those lead to different fixture questions, and controls cannot sensibly document an unnamed operation

21 points
MI
MinaArcher0424
Replying to PriyaIO

The former operator describes straightening the flange after removal. The final numbers were recorded afterwards. I have no numerical reading before straightening.

12 points
AN
AnilAllen0288
Replying to MinaArcher0424

Then the final sheet can't tell you how much the original fixture missed by. It tells you what came out of the corrected route.

18 points
DI
DineshBrown0908
Replying to MinaArcher0424

Do the old records identify which bracket drawing was used? A changed requirement could matter before you compare those numbers with today's parts.

4 points
MI
MinaArcher0424
Replying to DineshBrown0908

Two drawing revisions appear in the folder. Only the later one is named on the final sheet. I am separating the earlier notes until I can establish their use.

16 points
JA
JamieBell0643
Replying to MinaArcher0424

Could the former operator identify an untouched sample? That might help the process team, though I wouldn't assume anything on the accepted-parts shelf escaped correction

8 points
MI
MinaArcher0424
Replying to JamieBell0643

He cannot identify an untouched one. The retained examples were selected after final acceptance. We cannot use them as uncorrected evidence.

9 points
PR
PriyaIO
Replying to MinaArcher0424

Who proposed more restraint, and have they seen that distinction? I'd want the new fixture designer to see what is missing before inheriting the old answer

3 points
MI
MinaArcher0424
Replying to PriyaIO

Our internal planning note proposed it. The fixture designer had only received the final sheet. I have sent the operator's description and the missing-measurement issue too.

23 points
AN
AnilAllen0288
Replying to MinaArcher0424

Good. Let them disagree with the old method. The correction may have been the cheapest available fix at the time, not a design requirement handed down forever.

11 points
DI
DineshBrown0908
Replying to MinaArcher0424

What does quality need for a new comparison? I mean the stages where readings should be taken, not another reading from an already corrected sample.

20 points
MI
MinaArcher0424
Replying to DineshBrown0908

Quality and process are defining incoming, released and any corrected measurements for a current-part trial. No trial results yet. I have withdrawn the extra-restraint suggestion from our requirements list.

11 points
JA
JamieBell0643
Replying to MinaArcher0424

Will the inspection supports be defined in that trial too? Otherwise you may still struggle to explain differences between stages even when the part identifiers match

22 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.