can the last carton belong to two jobs on the planning sheet?

NicoBench_8ec3b3 · 15 Sept 2026, 09:26 UTC

Reply to discussion
NI
NicoBench_8ec3b3
I'm sketching a comparison between manual packing and a future palletising cell. Where do you put the time spent dealing with leftovers from the outgoing product: the old job, the new job, or a separate changeover line? I can make either job look better by moving that line. I'd rather settle the convention before collecting times. This is about planning, not choosing a robot speed.

3 replies

SA
SaraArcher0374
Replying to NicoBench_8ec3b3

Use a separate changeover line, with explicit start and finish events. Keep the whole comparison window as well. Moving a line between jobs should not change its total.

0points
CH
ChloeAllen0309
Replying to SaraArcher0374

I'd also keep labour time separate from elapsed time, because two people clearing and preparing in parallel shouldn't magically turn ten minutes on the clock into twenty minutes of downtime.

0points
NI
NicoBench_8ec3b3
Replying to ChloeAllen0309

Thanks, the separate labour total is the bit I hadn't allowed for. I'll keep the changeover visible rather than hide it under either product. Still need to define when the outgoing job actually ends.

0points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.