Use a separate changeover line, with explicit start and finish events. Keep the whole comparison window as well. Moving a line between jobs should not change its total.
can the last carton belong to two jobs on the planning sheet?
NicoBench_8ec3b3 · 15 Sept 2026, 09:26 UTC
I'm sketching a comparison between manual packing and a future palletising cell. Where do you put the time spent dealing with leftovers from the outgoing product: the old job, the new job, or a separate changeover line?
I can make either job look better by moving that line. I'd rather settle the convention before collecting times. This is about planning, not choosing a robot speed.