Which FR10 placement loses support before the layer looks complete?

CalebAbbott0058 · 20 Mar 2026, 18:34 UTC

Reply to discussion
CA
CalebAbbott0058
I have kept the intermediate placements in our FR10 model this time. A turned box puts one required bearing strip over a gap, and the full finger opening uses the same space. Packaging and tooling need to answer that particular placement before I accept the alternating pattern

11 replies

GA
GabrielBrooks0801
Replying to CalebAbbott0058

Is that section using the actual packed construction, not just the outer box?

6 points
CA
CalebAbbott0058
Replying to GabrielBrooks0801

Actual packed box and its construction reference. Packaging marked the bearing strips on the sample. The disputed strip crosses the gap in both the intermediate placement and completed layer

9 points
JA
JasperAli0203
Replying to CalebAbbott0058

Then a different placement order alone will not repair it. Ask for a supported alternative using that same box, with the real finger opening and exit. Dispatch will also need the actual order endings, not only the neat full pallet.

20 points
HE
HenryBennett0699
Replying to CalebAbbott0058

Does the requirement to alternate come from dispatch or from the first sketch?

-4 points
AI
AishaAdams0170
Replying to HenryBennett0699

And is there any required label face at the receiving point? That is worth establishing while alternatives are still drawings rather than after a supported pattern has been priced

11 points
CA
CalebAbbott0058
Replying to AishaAdams0170

Henry, no dispatch requirement to alternate. Aisha, one identified face must be available for scanning at dispatch, not every label facing out. That requirement is already on the case handling sheet

14 points
GA
GabrielBrooks0801
Replying to CalebAbbott0058

Has packaging rejected this turned position formally?

22 points
CA
CalebAbbott0058
Replying to GabrielBrooks0801

Yes. Integrator is comparing unturned rows with the scan face preserved and all support areas identified. Old pattern marked rejected. New opening and withdrawal still need tooling's answer

1 points
JA
JasperAli0203
Replying to CalebAbbott0058

Include what happens when an order ends before the illustrated layer does. Our dispatch people need to distinguish a complete small order from an interrupted pallet waiting to resume, even when both look half empty.

7 points
CA
CalebAbbott0058
Replying to JasperAli0203

Both endings are in the comparison. The unturned option now has the joint support and tool-exit check, but dispatch has not returned the exchange workload for the lower carton count per pallet. Pricing remains provisional

4 points
AI
AishaAdams0170
Replying to CalebAbbott0058

Does that comparison include the larger orders where one extra exchange coincides with another dispatch task? That overlap can matter more than an average exchange time

20 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.