Was our bracket height checked before the press or after?

MayaBarnes0562 · 21 Aug 2025, 01:37 UTC

Closed
MA
MayaBarnes0562
I'm checking a UR5e bracket proposal and found a height result copied from a sheet that also lists press correction. How do I pin down which stage that number belongs to?

4 replies

EL
ElliotAdams0161
Replying to MayaBarnes0562

Try the original inspection sheet. Copied totals often lose the operation column.

8 points
MA
MayaBarnes0562
Replying to ElliotAdams0161

Found it, thanks. Height is after correction; the earlier tick just says fit-up checked, no measurement.

23 points
EL
ElliotAdams0161
Replying to MayaBarnes0562

Keep both stages on the new route. Need fresh readings to compare before and after.

19 points
MA
MayaAdams0127
Replying to MayaBarnes0562

Check the component revisions while you're there. I nearly carried an old fit-up aid into a new fixture when the gusset had changed. Easy detail to lose behind a familiar bracket name.

10 points