I am comparing an FR5 option for exchanging steel blanks at our mill, but the proposal draws the blank and forgets the gripper and open door; who should own proving that the complete tool can get in and back out before I put a base position in the plan?
The integrator should coordinate the combined route review with the machine owner and toolmaker; have they actually surveyed your open door, including the handle, or is this still catalogue geometry?