I put the setter's trolley route on our brass-blank layout and it crosses the proposed FR5 stand. The robot sketch also lacks the complete tool and open door. We have not selected a position. I'd like the human access and tool route reviewed on one drawing this time.
Include how often that change happens and who does it, so moving the trolley stops looking like a harmless little inconvenience on the cost comparison.
Use the actual trolley for that early review. In a teaching exercise we moved a rectangle on the plan and forgot the person steering it. The trolley fitted. The person had apparently been deleted from the workforce.
Hana, the setters reviewed both footprints with the trolley. One blocks their turning space and is ruled out. Daniel, operator position was included, which made that obvious.
Ravi, we changed sides in that exercise. Increasing the gap on the original side just moved the clash into the next aisle. Different layout from Emma's, but it stopped us fixing one rectangle at a time.
When that comes back, will the setters see the same final arrangement again? Worth checking nothing moved into their space while the tool route was being resolved.