I'm preparing our sample verification handover for Fairino FR10 in a workshop fixture inspection cell, using a fixture-mounted coupon. The notes are mostly pendant screenshots without revision details.
They show the main routine but omit subprograms, fixture assumptions and expected ordinary PLC signals. I need a usable structure while the original integrator is still available
@JamieBrown0904 You're right to limit my wording. The map supports understanding the program; recovery instructions must come from the responsible integrator's approved procedure, not from inferred call order.
I've settled the handover structure: start from the matching export, map dependencies and identify their owners. I'll count it operationally ready only after the responsible integrator verifies the references, including recovery