Our aluminium-blank loading proposal shows an FR10 reaching the fixture, but the gripper and open door are absent, so I have asked for the surveyed machine outline before choosing a base position; what needs to accompany that from the tooling side?
Our brass-blank review is still carrying provisional fittings, so I'd ask for those explicitly along with the adapter, fingers and held blank. A clean model without the undecided bits can look much more certain than it is.
Toolmaker has supplied the main assembly and marked the unresolved fitting space, which helps, but I am still waiting for the door survey before the integrator can compare entry and loaded withdrawal on the same layout
Has the survey arrived, Isabel? Interested whether the original position survives it; we still had maintenance access to check after finding a promising side position on ours.