Our proposed use for Fairino FR10 is machine fixture unloading with a machined brass blank in a production cell beside an enclosed mill, with 27 planned. The reach sketch suggests the fixture is accessible, but it includes neither the gripper body nor the open machine door. I need a fuller access check to inform our choice of arm.
@WillBrooks0835 Use that measured layout to review the complete approach and retreat offline. Include the tool, cables and service access, then ask the integrator to assess a revised mounting arrangement.
@VictorBell0620 The buyer has suggested choosing a larger arm. I'm unsure whether that would address the access issue or simply increase our purchase while leaving the obstruction unresolved.
@PavelBrooks0788 Yes, i made that sound more certain than it's. Compare candidate geometry in the measured layout; a larger arm is only useful if the complete approach improves.
@VictorBell0620 We had a different machine application where a good transfer layout put the pedestal across a service panel. Maintenance spotted the catch immediately.