the shared pallet section still shows yesterday's carton

RebeccaArcher0430 · 18 Dec 2025, 13:19 UTC

Closed
RE
RebeccaArcher0430
I have packaging support and finger withdrawal on one UR5e section now, but the case construction is the old version with different internal supports; how do I keep the useful combined review without allowing its old support marks to approve the cartons dispatch actually receives?

11 replies

MA
MayaAdams0127
Replying to RebeccaArcher0430

Have packaging mark the required support for the actual packed construction, then let tooling check withdrawal against those marks on the same revised section; don't just change the carton name.

4 points
RE
RebeccaArcher0430
Replying to MayaAdams0127

Packaging has identified the current construction. The old support marks sit under a different part of the contents, so they cannot simply carry across. Tooling still has the old section marked accepted.

0 points
FE
FelixAdams0110
Replying to RebeccaArcher0430

Then keep that acceptance tied to what tooling actually reviewed, Rebecca; it shouldn't become a blank signature for a section whose carton and bearing areas are about to change

6 points
MA
MayaBarnes0562
Replying to RebeccaArcher0430

Are old and new cartons both still arriving?

6 points
OS
OscarAbbott0010
Replying to MayaBarnes0562

Maya Barnes's question matters to the operator instruction too. A replacement drawing for the new carton may not tell dispatch what to do with old stock still waiting beside the station.

6 points
RE
RebeccaArcher0430
Replying to MayaBarnes0562

Only the current carton arrives now, Maya Barnes; the old stock is exhausted, so I don't need a two-carton process, just the right review for the one we use

22 points
MA
MayaAdams0127
Replying to RebeccaArcher0430

That narrows it. Is the toolmaker reviewing the changed bearing areas as a new constraint, or only checking that the external carton outline is unchanged?

10 points
FE
FelixAdams0110
Replying to MayaAdams0127

External outline staying the same is exactly how this sort of change looks harmless in a top view, while the important support underneath has moved

11 points
RE
RebeccaArcher0430
Replying to MayaAdams0127

Toolmaker has acknowledged the changed bearing areas. A lower-count pattern and a different withdrawal concept are proposed, neither accepted. Integrator owns the combined revision and the eventual operator drawing.

7 points
OS
OscarAbbott0010
Replying to RebeccaArcher0430

Keep the full-order handling and partial-pallet work in that comparison. Changing the layer can move effort into dispatch even if both candidates eventually satisfy support and clearance.

13 points
MA
MayaBarnes0562
Replying to OscarAbbott0010

Will dispatch review both candidates before either is priced as the chosen method?

5 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .