Bracket correction hidden behind the finished inspection sheet

NinaCarter1023 · 9 Dec 2025, 10:09 UTC

Closed
NI
NinaCarter1023
I was given a finished bracket pass sheet for our FR10 fixture estimate, then found a correction note between welding and that inspection. The restrained alignment check is earlier still. Which of those records can help us judge the fixture without giving it credit for the correction bench?

2 replies

LE
LeoChen1145
Replying to NinaCarter1023

Ask for the identified bracket's released check before correction, with its drawing revision and measurement method. If that stage is missing, keep the finished pass as a finished result and the correction as separate work. Neither reconstructs the missing measurement

24 points
NI
NinaCarter1023
Replying to LeoChen1145

Inspection found the correction time but no released reading before it. I've left that missing stage in the study request and kept the labour in our estimate. Thanks; the final pass stays useful without answering everything.

2 points