Why price this FR10 position before drawing the brass-blank gripper?

LeoBarnes0536 · 23 Apr 2026, 16:06 UTC

Reply to discussion
LE
LeoBarnes0536
Our removal sketch clears the blank, omits its gripper and ignores the open door. What exactly was priced?

18 replies

OW
OwenAbbott0051
Replying to LeoBarnes0536

Was the quotation based on that sketch, or does the integrator have a fuller model you have not received? Ask which tool assembly and machine survey it uses.

5 points
LE
LeoBarnes0536
Replying to OwenAbbott0051

Quote uses that sketch. Tool envelope provisional. No open-door survey.

13 points
PA
PavelBrooks0788
Replying to LeoBarnes0536

Is the tool already designed, or are they still choosing the fingers and adapter? I'd want to know whether you're waiting for a missing file or for actual design work.

13 points
LE
LeoBarnes0536
Replying to PavelBrooks0788

Actual design work. Fingers outlined, body and adapter not selected.

17 points
JA
JackCarter1037
Replying to LeoBarnes0536

Our setter found a trolley conflict before the next drawing was made; can yours mark the fixture-change route while the integrator is still choosing the complete tool?

2 points
LI
LiamBarnes0577
Replying to JackCarter1037

I would include maintenance's occasional access as well. A position can leave daily loading clear and still obstruct the panel someone needs when the machine is down.

2 points
PA
PavelBrooks0788
Replying to LiamBarnes0577

Liam, useful distinction. Leo, who is combining those views rather than collecting three separate sketches?

3 points
OW
OwenAbbott0051
Replying to PavelBrooks0788

The integrator needs an agreed survey to work from. The machine owner should confirm it represents the actual opening and required access tasks.

7 points
LE
LeoBarnes0536
Replying to PavelBrooks0788

Machine owner has supplied the survey. Integrator combining it with tooling. Setter route included.

2 points
LI
LiamBarnes0577
Replying to LeoBarnes0536

Was maintenance included too? The setter's route will not necessarily expose the service-panel problem I meant.

13 points
LE
LeoBarnes0536
Replying to LiamBarnes0577

Yes. Their panel opening is marked separately. No conflict with the original stand there.

21 points
PA
PavelBrooks0788
Replying to LeoBarnes0536

Any complete tool yet?

5 points
LE
LeoBarnes0536
Replying to PavelBrooks0788

Returned model puts the loaded gripper into the door handle. Integrator proposes moving the stand outward.

15 points
JA
JackCarter1037
Replying to LeoBarnes0536

Does that outward position preserve the setter's marked route, or does it move the clash from the drawing's machine to the person doing the changeover?

5 points
LE
LeoBarnes0536
Replying to JackCarter1037

It occupies the trolley turn. Setter rejected it. No other floor position available in this bay.

11 points
LI
LiamBarnes0577
Replying to LeoBarnes0536

Then keeping the current manual job belongs in the decision. You do not owe the first sketch an installation.

13 points
LE
LeoBarnes0536
Replying to LiamBarnes0577

We have withdrawn this purchase proposal. Manual removal stays; no further tool study commissioned.

0 points
OW
OwenAbbott0051
Replying to LeoBarnes0536

Make sure purchasing has that decision against the quoted position. The incomplete original sketch should not remain an apparently live option in their comparison.

3 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.