Our FR5 brass-blank candidate needs a complete gripper and open-door check, but the stand already overlaps the trolley turning space marked by the setter; I'd like to resolve that fixed conflict before people spend another week arguing over whether a smaller rear fitting could save a position the trolley cannot use.
Has production agreed the setter's required turning space as a layout constraint? If that marked route is necessary and the stand occupies it, the integrator can reject this position while still finishing the tool geometry for other candidates. A smaller fitting won't move the stand.
Production has now accepted the marked turning requirement and the integrator withdrew this stand position; other positions remain under review with the complete tool and normal door opening, so we have a useful rejection without pretending the arm choice is settled.