Can you link each photo to a row? I'd identify the clamped checks first, then leave the rows with no evidence undecided.
How do I stop these old clamped checks becoming our acceptance figures?
LucyCarter1002 · 4 May 2025, 10:14 UTC
21 replies
The photographs have part tags. Six rows match. Other pictures were renamed during an old folder move and I cannot link them reliably.
9 pointsStart with the six, then. No need to guess the others into place.
17 pointsAre those six all the same bracket revision? We have been caught by mixed retained samples.
3 pointsGood question. Tags identify parts, but the spreadsheet has no drawing revision. I'll check against the work orders.
2 pointsTwo revisions. Four of the six belong to the one now proposed. The other two have a different gusset.
18 pointsKeep the groups separate while you review them.
3 pointsI ran into the mystery-correction version of this recently. Could you find what was actually changed on those four parts, or is 'corrected' all anyone wrote?
10 pointsAlso identify the reference used for each measurement; a tag connects a number to a part, but the photograph may still not show how that dimension was taken.
-1 pointsThe measurement method is recorded for those four. Correction is just a tick box. We don't know what was done or whether the recorded value came before it.
9 pointsTo answer Thomas, they used the same inspection drawing reference. That helps with the dimensions, but doesn't fill the correction gap.
14 pointsAny fixture repair history? Our inherited shim was compensating for a repaired mounting face.
13 pointsThere is a repair entry for one support. No dimensions attached. I'll ask maintenance what else survives before anyone copies the present packing pieces.
10 pointsCan you photograph the current support arrangement cheaply while that search happens? It would give the designer something definite to work from.
2 pointsYes, maintenance has photographed it during the survey. We are treating the repair and packing as things to explain, not instructions for the new fixture.
5 pointsThat saved us an argument too, writing down 'we don't know why this is here' instead of giving a mystery strip the grand title of correction feature.
2 pointsWhat will the new trial record for incoming fit-up? The old records start at the fixture, which may hide differences already present in the loose parts.
-2 pointsI'd include which component revisions went into each assembly as well, after finding those two gussets mixed into the old set.
0 pointsQuality and the fixture designer are defining those checks. We have retained the four traceable cases as background, with their correction uncertainty stated. They won't become final acceptance figures for the new design.
23 pointsDid maintenance find anything more about that repaired support? That's the loose end I'd still be curious about.
3 pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .