our FR10 blank-removal view ends before the door matters

ZaraBaker0482 · 2 Nov 2025, 18:33 UTC

Closed
ZA
ZaraBaker0482
Our FR10 sketch reaches the polymer blank in the fixture but omits the gripper body and open door, so I have asked the integrator for the held assembly through the whole removal route before we choose a position; the setter also needs to judge access to the fixture.

6 replies

GA
GabrielAbbott0018
Replying to ZaraBaker0482

Is the door position measured on the machine, or still taken from a generic drawing?

23points
ZA
ZaraBaker0482
Replying to GabrielAbbott0018

Generic so far, Gabriel, and the owner has agreed to survey it; I am keeping that separate from the toolmaker's assembly drawing because neither supplier can fill the other gap by assumption.

15points
DA
DavidAllen0345
Replying to ZaraBaker0482

Put both into one model when available. Include the adapter and connections, not only the jaw tips. Otherwise the blank clears while a fitting quietly occupies the handle.

22points
ZA
ZaraBaker0482
Replying to DavidAllen0345

The assembly drawing includes the fittings now, David, with the held blank shown at the proposed grip depth, but the actual open-door survey is still outstanding so no route has been accepted.

16points
DA
DavidAllen0345
Replying to ZaraBaker0482

Who is chasing that survey? The useful tool detail is waiting on one missing measurement set, not another round of robot selection.

15points
GA
GabrielAbbott0018
Replying to ZaraBaker0482

Has it arrived, Zara? Interested whether the original approach survives the real door.

-3points