fr10 carton section gives the same space to support and withdrawal

ElliotCarter1031 · 4 May 2026, 05:32 UTC

Reply to discussion
EL
ElliotCarter1031
I brought the filled shipping carton to the FR10 review. Packaging marked the end support it needs; tooling marked the finger withdrawal gap. Same strip of space. The integrator is combining those views before we order tooling. I want the placement order in there too, because the final layer has neighbours that aren't present when the first turned carton arrives.

13 replies

NA
NaomiAbbott0071
Replying to ElliotCarter1031

Give the integrator the exact lower-layer revision as well, because a correct filled-carton section can still be placed over an old arrangement of neighbours.

16 points
EL
ElliotCarter1031
Replying to NaomiAbbott0071

Checked. Packaging used the old lower layer; tooling's wider gap came later. Neither had the other's revision in its comparison.

3 points
BR
BrunoBrooks0800
Replying to ElliotCarter1031

Mark that combined view withdrawn while they reconcile it. Our current carton review has the same support-versus-finger conflict, and I don't want stores manufacturing a tidy drawing that both owners thought somebody else had checked.

3 points
SO
SofiaBell0630
Replying to ElliotCarter1031

Who brings the short and returned orders into that review? A workable full-layer sequence may still leave the packer with an unsupported stopping point.

19 points
EL
ElliotCarter1031
Replying to SofiaBell0630

Packing lead has both. The mixed drawing is withdrawn. They are comparing straight rows, fewer cartons, with defined short-order endings.

1 points
OL
OliverBrooks0798
Replying to ElliotCarter1031

Does the lower count add a pallet during an ordinary order, or only on unusual larger ones?

19 points
EL
ElliotCarter1031
Replying to OliverBrooks0798

Adds one on a common order. Dispatch is costing the exchange and staging space, not only the pallet itself.

4 points
NA
NaomiAbbott0071
Replying to ElliotCarter1031

Keep the returned partial pallet on that space plan too, so it does not compete with the new full pallet somewhere the drawing calls empty.

11 points
SO
SofiaBell0630
Replying to ElliotCarter1031

Has tooling completed withdrawal for the straight candidate yet, Elliot? It would be useful to know whether you're pricing a defined sequence or still a proposed layout.

2 points
EL
ElliotCarter1031
Replying to SofiaBell0630

Complete support and withdrawal review passed for the specified straight full and partial arrangements. Dispatch found the added staging position would block our returns route. Another position is being checked.

20 points
BR
BrunoBrooks0800
Replying to ElliotCarter1031

Then keep that missing staging decision in the quote. The tool may have a workable sequence without the warehouse yet having a workable job.

18 points
EL
ElliotCarter1031
Replying to BrunoBrooks0800

Alternative staging found, farther from packing. Lead has timed the route and added it to the revised price. Purchasing is comparing that with manual packing before authorising a trial.

4 points
OL
OliverBrooks0798
Replying to ElliotCarter1031

Who checked the covering packer's return to a partial order from that farther position?

18 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.