I cannot compare the two FR10 tooling quotations fairly. One includes a separator arrangement. The cheaper one includes a vacuum tool and a photograph of it holding one enclosure panel. Our panels arrive nested in a stack. Both suppliers have priced the same drawing, but apparently not the same problem.
Sara, has either proposal answered how the check handles a partly attached second panel?