Arm and gripper priced. Fixtures still vague. (fixture loading)

HanaChan1057 · 20 Apr 2026, 22:18 UTC

Closed
HA
HanaChan1057
I'm pushing for Universal Robots UR5e to do fixture loading with a small plastic enclosure in a small owner-run workshop, starting with 221. I priced the arm and gripper. Fixtures and staff time? Much vaguer. My colleague's annoyed, fairly enough. I'd like a small pilot we can both judge.

2 replies

EL
EllaAllen0294
Replying to HanaChan1057

Have you measured the whole manual job, preparation included? Timing just the transfer could hide the same missing labour again.

2points
HA
HanaChan1057
Replying to EllaAllen0294

@EllaAllen0294 We watched a batch. Preparation took longer than transfer. My estimate had basically made that work disappear by wishing.

12points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .