The tool outline overlaps the door pocket on our FR10 proposal, although the blank itself clears. I spotted it while checking the mill drawing. Is that enough to reject the base position?

18 replies

GA
GabrielBell0627
Replying to CallumBell0621

Which outline overlaps? The open fingers, the closed gripper, or some rectangle somebody drew round both? You need that distinction before moving the whole arm. A sketchy tool envelope can kill a decent layout or approve a bad one.

18 points
CA
CallumBell0621
Replying to GabrielBell0627

It's the rectangle around both finger positions. The gripper body is drawn separately, and that seems clear in this view

11 points
GA
GabrielBell0627
Replying to CallumBell0621

Then you haven't shown a collision yet. You have shown a space that needs checking. Does the tool need to open there, or is that after it has moved further into the machine?

17 points
CA
CallumBell0621
Replying to GabrielBell0627

I don't know where it opens yet. The sequence sheet just says load, release, retract. No intermediate positions

7 points
GA
GabrielBell0627
Replying to CallumBell0621

That's the missing bit. Ask for the release pose and the first withdrawal move with the actual finger geometry. Nobody can answer from 'retract'.

4 points
HA
HazelAdams0136
Replying to CallumBell0621

Cannot choose the mounting position from one view. Add a section through the doorway, with the tool at release height.

13 points
GA
GabrielBell0627
Replying to HazelAdams0136

And include the wrist in that section. We've spent all this time discussing fingers while the part behind them is apparently invisible.

13 points
LE
LeahAli0234
Replying to CallumBell0621

Our loading position cleared beautifully. The trouble was reaching a dropped part afterwards, because the new base blocked the access door. Get whoever clears stoppages to look at this drawing too.

10 points
CA
CallumBell0621
Replying to LeahAli0234

I asked our setter. He needs the front opening for fixture changes, so a base straight in front would create another problem

19 points
JO
JoFixtures
Replying to CallumBell0621

Give the designer that fixture-change requirement now, with the trolley space marked, or you'll get a lovely robot drawing that quietly borrows the setter's entire working area.

19 points
GA
GabrielBell0627
Replying to CallumBell0621

Has anyone put the actual door travel on the plan? A rectangle labelled 'door' isn't its swept space. Sorry to labour it, but that detail matters here.

5 points
CA
CallumBell0621
Replying to GabrielBell0627

Yes, the machine supplier's section shows its full travel. Thanks for the wrist point earlier; our designer hadn't included the rear of the tool adapter

15 points
GA
GabrielBell0627
Replying to CallumBell0621

Useful catch. Now check the same assembly on the way out with a part held. The incoming empty tool and outgoing loaded tool don't occupy identical space.

18 points
LE
LeahAli0234
Replying to JoFixtures

Who gets the final drawings after installation? Ours stayed in somebody's email and night shift kept using the first print. Put a revision on the copy by the machine.

21 points
CA
CallumBell0621
Replying to LeahAli0234

Maintenance will own the layout copy. We already have a drawing folder for this mill, so I'll ask for the approved version there

15 points
HA
HazelAdams0136
Replying to CallumBell0621

Good home for it. Include tool revision as well; fingers change without anyone thinking the layout changed.

10 points
CA
CallumBell0621
Replying to GabrielBell0627

The updated section shows clearance for release, but the loaded withdrawal still needs work. I'm leaving the base choice open until that's drawn

18 points
GA
GabrielBell0627
Replying to CallumBell0621

Fair result. When that path arrives, check its intermediate poses too. Two clear endpoints can still have something expensive between them.