Our handover for inspection-cycle coordination with Fairino FR5 in a small production cell with external inspection recipes, using a machined bracket, is mainly pendant screenshots. I'm trying to improve it while the original integrator is available.
The pictures lack revision details and cover the main routine without its subprograms, fixture assumptions or expected ordinary PLC signals.
Our installed revision matches a controlled export, but I've identified screenshots from an older program copy. Their different routine names explain the mismatch in our notes.
@AishaBarnes0605 Fair distinction. I meant understanding the dependencies, not choosing a restart point. Recovery needs its own approved reference from the responsible integrator.
Retain the images as labelled historical material, with their established revision references, so they explain the discrepancy without appearing to describe the installed program.
I haven't completed a dependable handover. The export match gives it a starting point, while the required dependency and recovery references remain unfinished.