Forums Applications & integration Our FR10 bracket pass includes work nobody put in the quote Our FR10 bracket pass includes work nobody put in the quote HenryBrooks0786 · 1 May 2026, 06:40 UTC
Reply to discussion Released bracket fails. Final check passes after fitting-bench work. FR10 quote includes neither that work nor reinspection.
6 replies Link the fitting-bench operation to the same bracket and failed feature, then have quality confirm the first and final measurement methods before assigning its cost.
17 pointsSame bracket and angle confirmed. Fitter straightened it. No reliable duration, just the bench visit.
14 pointsPut straightening and reinspection into the scope as unmeasured work now. Then observe a current group with the planner. Waiting for a perfect historical time is how a known operation stays free in the quote.
19 pointsPlanner observed a group. Separate fitter time, inspection travel and waiting. Quote being corrected.
7 pointsDid the observation keep incoming preparation separate from released-part correction, so the fixture review can see where each task occurs?
9 pointsYes. Revised estimate includes both separately and reinspection. Thanks, Elena. The old free-correction line is gone.
23 pointsAdd to the discussion Welcome to Application Robot Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.
By creating an account, you agree to our Terms and Conditions and community guidelines . Read our Privacy Policy for how your information is handled.