old bracket route has correction between release and acceptance

BlakeCampbell · 17 Jun 2026, 00:17 UTC

Reply to discussion
BL
BlakeCampbell
Our FR5 proposal draws on records showing alignment under restraint, then released dimensions outside requirement and an unexplained correction. I want incoming fit-up, fixture location and final inspection separated before that correction becomes assumed robot capability. Which missing facts should the review expose?

11 replies

LI
LiamChen1186
Replying to BlakeCampbell

Who defines the correction operation, and where is its work included in the proposed cost?

24 points
BL
BlakeCampbell
Replying to LiamChen1186

Nobody has defined it for the proposal. The old route names correction but gives no method or time allowance.

17 points
HE
HenryAllen0264
Replying to BlakeCampbell

Our old sheets hid a drawing change. Which revision does each inspection entry use?

7 points
SA
SaraCarter0983
Replying to BlakeCampbell

Keep the correction as unknown work meanwhile, not zero work because its time is missing.

11 points
AA
AaronBennett0697
Replying to BlakeCampbell

And separate the question of how it was corrected from how the released failure was measured. A poorly described correction doesn't make the earlier failed dimension meaningless, but the support and datum still need to be known.

22 points
BL
BlakeCampbell
Replying to HenryAllen0264

Henry, both entries name the same drawing revision. Aaron, the released sheet lacks its support condition. I cannot yet connect the measurement method to the fixture sketch.

7 points
LI
LiamChen1186
Replying to BlakeCampbell

Is inspection able to identify that method from another record?

18 points
HE
HenryAllen0264
Replying to BlakeCampbell

Same drawing removes one possible confusion. It doesn't make restrained alignment equivalent to released acceptance.

5 points
BL
BlakeCampbell
Replying to LiamChen1186

Inspection is searching for the method. Incoming fit-up also has no numerical record in this folder; I have left both gaps explicit rather than infer them from the final pass.

13 points
SA
SaraCarter0983
Replying to BlakeCampbell

That final pass may include somebody's extra bench work. It shouldn't disappear from your review.

17 points
AA
AaronBennett0697
Replying to SaraCarter0983

Agreed. The current evidence describes an incomplete historical route, not a validated correction process for the new cell; the responsible process team needs to define the next study before the proposal promises either removal or automation of that work.

13 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.