Which complete-tool positions belong in our FR5 steel-blank access check?

Marcus_Casey · 30 Jul 2026, 07:25 UTC

Reply to discussion
MA
Marcus_Casey
Our FR5 sketch reaches the fixture for 128 planned steel blanks, but neither the gripper body nor the open door exists in it; what fuller access evidence should I get before choosing the arm for this compact workshop?

16 replies

EL
EllaArcher0381
Replying to Marcus_Casey

Can the integrator start from the installed machine opening and a complete tool candidate, including the held blank? I would ask for the unloading sequence rather than one pose at the fixture.

10points
LE
LeahAbbott0060
Replying to Marcus_Casey

Ask the setter which way the fixture actually comes out for changeover too. It would be frustrating to approve a robot route and discover the stand blocks their ordinary job.

6points
MA
Marcus_Casey
Replying to EllaArcher0381

The tool supplier has a candidate drawing, but our machine outline predates the current door handle; I will get the installed opening checked first.

21points
AM
AmyBell0641
Replying to Marcus_Casey

Keep the old outline marked superseded, then. Otherwise it may reappear beside the more detailed gripper and make the new review look complete.

0points
PR
PriyaChen1177
Replying to Marcus_Casey

And be clear what this comparison establishes: geometry and access questions. It doesn't replace the full application risk assessment or verify machine access conditions merely because the door is drawn open.

15points
EL
EllaArcher0381
Replying to LeahAbbott0060

Leah, would you include the fixture trolley footprint or just the person moving it? I'm thinking about the turn beside the proposed base.

10points
LE
LeahAbbott0060
Replying to EllaArcher0381

Both, with the fixture on the trolley. A person squeezing through isn't the same thing as getting their load around that corner.

16points
AM
AmyBell0641
Replying to EllaArcher0381

Also the empty gripper after release. Open fingers can need space the held-blank pose doesn't show.

4points
MA
Marcus_Casey
Replying to LeahAbbott0060

The survey now includes handle projection and trolley route; the candidate tool still needs its rear fitting added before the integrator compares withdrawal.

5points
PR
PriyaChen1177
Replying to Marcus_Casey

Has the tool supplier defined hose routing assumptions for that fitting? A nominal body outline with an unspecified connection behind it still leaves an occupied region uncertain.

7points
EL
EllaArcher0381
Replying to PriyaChen1177

Use a clearly identified provisional envelope if the exact fitting choice is pending, but have the supplier bound it; don't invent a clearance allowance yourself.

12points
MA
Marcus_Casey
Replying to EllaArcher0381

Supplier supplied the missing envelope and routing assumptions; the combined drawing shows the present withdrawal candidate conflicting with the door handle.

17points
AM
AmyBell0641
Replying to Marcus_Casey

That rules out this candidate as drawn, not the FR5 altogether. Changing tool orientation or base position means another complete sequence check.

19points
LE
LeahAbbott0060
Replying to AmyBell0641

And return any moved-base option to the setter. The trolley route we just added can disappear again when someone fixes the robot's clash.

21points
MA
Marcus_Casey
Replying to LeahAbbott0060

Original candidate is held; two revised arrangements are being compared with the setter's route retained, and I haven't selected an arm from either one yet.

17points
EL
EllaArcher0381
Replying to Marcus_Casey

Thanks for reporting the actual conflict. It answers why the original reach picture was insufficient without pretending the revised arrangements have already passed.

3points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.