Which complete FR10 tool view should decide our steel-blank removal position?

EricBurke · 4 May 2026, 06:33 UTC

Reply to discussion
ER
EricBurke
Our FR10 steel-blank sketch reaches the fixture without showing the gripper body or open door, so what complete route should I request before a stand position goes into the order?

17 replies

PA
PavelBrooks0788
Replying to EricBurke

Is the gripper and adapter assembly already specified? The route needs that actual tool in its loaded, release and empty-return states, not just an envelope someone drew around the blank.

17points
ER
EricBurke
Replying to PavelBrooks0788

Gripper proposed, adapter still provisional; I have asked the toolmaker to identify the complete assembly before the next layout.

12points
RO
RobinBell0686
Replying to EricBurke

Include its rear fittings and routed connections. They're part of what has to pass the door, not a detail to add after choosing the mounting position.

25points
HA
HazelBennett0745
Replying to EricBurke

Ask the machine owner for the actual open-door survey. A brochure opening may omit the handle or the normal door position. Keep the setter's fixture-change task on that survey too.

19points
YA
YasminChan1050
Replying to HazelBennett0745

Who combines the machine survey and the toolmaker's assembly?

6points
ER
EricBurke
Replying to YasminChan1050

Integrator owns the combined view, with the machine owner supplying the survey and the setter marking fixture removal and trolley access.

15points
PA
PavelBrooks0788
Replying to EricBurke

Any actual tool assembly back yet?

12points
ER
EricBurke
Replying to PavelBrooks0788

Complete tool returned, including fittings; the first combined view puts its loaded body through the open door handle, so the integrator rejected that stand position.

4points
RO
RobinBell0686
Replying to EricBurke

Did they offer another position with the same tool, or a changed tool? I would keep those as distinct proposals rather than borrow one assembly's assessment for the other's route.

8points
ER
EricBurke
Replying to RobinBell0686

Another position with the same assembly, farther from the receiver; the full movement is under review and the setter says fixture change still has room.

7points
HA
HazelBennett0745
Replying to EricBurke

Does maintenance have its tool-removal and connection-access tasks in that farther view too? A clear transfer is only the regular operating part of the space question.

13points
ER
EricBurke
Replying to HazelBennett0745

Maintenance found enough access to disconnect the tool but no supported place for it once removed, so the integrator is adding that provision to the layout and price.

12points
YA
YasminChan1050
Replying to EricBurke

And does the farther price include the receiving station installation?

14points
PA
PavelBrooks0788
Replying to EricBurke

Eric, has the complete transfer reached the receiver successfully in the review, including open-finger withdrawal? I'd like that answer before all attention goes into the useful maintenance addition.

5points
ER
EricBurke
Replying to PavelBrooks0788

Full transfer and receiver release now clear in the reviewed model, Pavel, and the tool-rest provision has been accepted by maintenance; Yasmin, receiving installation is included in the revised quote.

20points
ER
EricBurke
Replying to EricBurke

Purchasing selected this complete arrangement for detailed design, with the smaller saving shown and the original position rejected; no hardware installation started.

6points
RO
RobinBell0686
Replying to EricBurke

Who carries the checked connection routing into detailed design? Good to hear it stayed attached to the tool instead of disappearing after the door comparison.

13points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.