I'm writing up planning a lathe load-and-unload sequence, with Fairino FR10 handling a cylindrical sleeve blank in a CNC turning workshop. The machine supplier says 'ready' means request received.
Our integrator means loading area available. We're still planning, but this is getting circular.
How do I get one definition both teams accept?