What should count as dimensional acceptance after welding?

OmarAllen0317 · 30 May 2026, 21:54 UTC

Reply to discussion
OM
OmarAllen0317
We're planning reviewing fixtures for welded mounting brackets with Fairino FR10 on a steel gusseted bracket assembly in a precision fabrication quality department. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine. This is a records review, not live welding adjustment.

3 replies

SA
SarahCarter1024
Replying to OmarAllen0317

Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.

24 points
OM
OmarAllen0317
Replying to SarahCarter1024

@SarahCarter1024 The sheets mix clamped checks and released measurements. Some don't say which. The drawing has the dimension, but our procedure leaves the support condition vague.

4 points
SA
SarahCarter1024
Replying to OmarAllen0317

Have quality and the drawing owner define the acceptance condition. Group the old results by known measurement state; that should make them comparable.

17 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.