The proposed brass-loading point sits inside our machine, while the tool drawing sits in another email and the door is shown closed; I want the full assembly checked together before choosing the FR5 position.
Yes, fixed in the proposed tool assembly. Complete comparison now shows the rear fitting overlapping the door stay during approach. Supplier is considering another connection arrangement
We had the setter mark fixture-removal space before the next layout revision, and it stopped a stand being moved into the only useful trolley position; can your machine contact include that now, Mei?
Machine contact has asked the setter to mark it. I have kept the connection change pending that combined review, including its full route rather than one clear approach picture