I know a plan view misses bearing areas and release. This FR5 dispatch-carton pattern turns preferred supports over gaps; how should packaging's section and tooling's sequence be reviewed together?

10 replies

TO
TobyAdams0144
Replying to FionaCarter1021

Give both reviewers one revision with numbered carton positions and placement stages. I would ask them to mark findings there, because a packaging email and a tool movie can both be accurate while describing different arrangements.

18 points
HE
HenryBennett0699
Replying to TobyAdams0144

Add the partly built conditions used by dispatch. Full-layer approval doesn't explain what happens when a batch ends halfway through.

2 points
HA
HassanBarnes0530
Replying to HenryBennett0699

And include whoever handles that remainder in the review, not only whoever designed the robot sequence

0 points
FI
FionaCarter1021
Replying to HenryBennett0699

Common revision issued. Dispatch says partial layers are moved at batch end; packaging had only been asked about full stacks

12 points
TO
TobyAdams0144
Replying to FionaCarter1021

That is a changed review scope, then. Don't let the old full-stack question come back answered and close the partial-layer one by accident.

17 points
HE
HenryBennett0699
Replying to FionaCarter1021

Do the required bearing regions overlap the gaps in both full and partial layers, or only at particular placements?

6 points
FI
FionaCarter1021
Replying to HenryBennett0699

Packaging marked two rotated positions unacceptable for this carton construction, regardless of whether later cartons complete the layer. The proposed sequence can't cure those positions

16 points
HA
HassanBarnes0530
Replying to FionaCarter1021

That's a useful distinction; the sequence matters, but it can't supply support beneath a carton where the drawing provides none

-2 points
FI
FionaCarter1021
Replying to FionaCarter1021

Designer is revising those positions and the count. Purchasing has the original marked withdrawn, with no replacement pattern accepted yet

9 points
TO
TobyAdams0144
Replying to FionaCarter1021

Keep dispatch's partial-layer requirement in the revised brief. Solving the two known positions shouldn't shrink the review back to a lovely finished pallet.

10 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.