Enough reach, incomplete drawing

BenBarnes0544 · 27 Aug 2026, 18:47 UTC

Reply to discussion
BE
BenBarnes0544
Our proposed use for Fairino FR5 is machine fixture unloading with a rectangular polymer blank in a compact machining workshop, with 172 planned. The reach sketch suggests the fixture is accessible, but it includes neither the gripper body nor the open machine door. I need a fuller access check to inform our choice of arm

19 replies

LI
LiamAdams0142
Replying to BenBarnes0544

@BenBarnes0544 Got measured outlines for the opening and gripper? An offline layout might catch what the reach circle misses.

17 points
BE
BenBarnes0544
Replying to LiamAdams0142

Checked them. The approach clips the handle; the workpiece clears. No wonder my first sketch looked so reassuring

19 points
LI
LiamAdams0142
Replying to BenBarnes0544

Use that measured layout to review the complete approach and retreat offline. Include the tool, cables and service access, then ask the integrator to assess a revised mounting arrangement.

10 points
BE
BenBarnes0544
Replying to LiamAdams0142

The buyer has suggested choosing a larger arm. I'm unsure whether that would address the access issue or simply increase our purchase while leaving the obstruction unresolved

10 points
LI
LiamAdams0142
Replying to BenBarnes0544

A larger arm should give you more mounting freedom, so that could be the easiest route to investigate.

12 points
CA
CallumChen1143
Replying to LiamAdams0142

A different arm geometry may introduce its own clearance problems. Increasing reach doesn't establish that the proposed tool can pass the existing handle obstruction.

1 points
LI
LiamAdams0142
Replying to CallumChen1143

@CallumChen1143 Yes, I made that sound more certain than it's. Compare candidate geometry in the measured layout; a larger arm is only useful if the complete approach improves.

19 points
LU
LuisCarter1043
Replying to LiamAdams0142

@LiamAdams0142 On our separate machine job, the first pedestal position blocked a maintenance panel. The transfer looked excellent until the maintenance person asked how they'd open it.

10 points
BE
BenBarnes0544
Replying to LuisCarter1043

Your example prompted me to compare our proposed pedestal with the service panel opening. That revealed another overlap to correct in the layout

19 points
LI
LinAli0183
Replying to BenBarnes0544

@BenBarnes0544 Could you move the pedestal for service? Or is putting it back a whole other job?

7 points
LI
LiamAdams0142
Replying to LinAli0183

Restoring location and checking the installation would become part of that proposal. Ask the integrator to compare it with a layout that preserves routine service access.

18 points
BE
BenBarnes0544
Replying to LiamAdams0142

The fixture requires a straight approach segment. Should we establish that constraint in the model before exploring alternative positions for the robot base?

23 points
LI
LiamAdams0142
Replying to BenBarnes0544

@BenBarnes0544 Yes. Include the required entry direction and withdrawal conditions, not just an end pose. A reachable point can still have no usable approach with the proposed tool.

11 points
LU
LuisCarter1043
Replying to LiamAdams0142

Our unloading retreat differed from loading because the held workpiece changed the envelope. Modelling the empty gripper alone gave us a very flattering answer.

12 points
BE
BenBarnes0544
Replying to LuisCarter1043

@LuisCarter1043 I'll include empty and loaded tool outlines. We also need to agree who owns the machine signals; that part of the quote is vague

17 points
CA
CallumChen1143
Replying to BenBarnes0544

Name whoever owns the interface work. Otherwise the robot and machine contacts can both think the other has covered fixture state and permission to enter.

13 points
LI
LinAli0183
Replying to CallumChen1143

I'm having trouble distinguishing process readiness from safe entry because the sales description makes them sound equivalent. Does the machine-ready signal establish both?

1 points
LI
LiamAdams0142
Replying to LinAli0183

@LinAli0183 A process-ready signal isn't automatically a safety function. The qualified cell assessor needs to define protective measures and restart requirements separately from the production sequence.

8 points
BE
BenBarnes0544
Replying to LiamAdams0142

Can we trial representative fixture geometry while the interface scope is still open? I'd like to move the access question along

11 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.