Our brass-blank loading sketch reaches the fixture. It leaves out the tool body and open mill door. I want a combined access view before choosing the FR10 position. Who should own that drawing?
The integrator should combine the actual machine survey and proposed tool assembly. Otherwise two people can approve their own half of an impossible arrangement.
A teaching layout we reviewed moved a stand to clear the tool and then blocked fixture removal, so get the setter's changeover route into this drawing before the stand goes wandering.
Include any proposed relocation cost with the alternative. A position that works only after moving something is a different proposal, not a free correction.
The alternative is farther along the machine. Setter has marked fixture removal. It stays clear, but the loaded tool route to the tray is still missing.
Which tool state did they check at the machine, Aaron? I would want the released blank and open fingers shown as well as the loaded approach, not one closed outline doing all three jobs.
Yes. It rules out the original position again. The farther position has a clear complete-tool route in the study, and the setter's access remains on that version.
Longer service routing needs pricing. The integrator has listed that and the tool revision. We are costing the farther position, not placing the arm order yet. Thanks, Nina, for spotting the closed-tool-only view.