We're considering Fairino FR5 for machine fixture unloading with a machined brass blank in a production cell beside an enclosed mill, with 34 planned.
The sketch reaches the fixture.
Trouble is, we left out the gripper body and open door.
I'd like to check access properly before choosing an arm
Use that measured layout to review the complete approach and retreat offline. Include the tool, cables and service access, then ask the integrator to assess a revised mounting arrangement.
The buyer has suggested choosing a larger arm. I'm unsure whether that would address the access issue or simply increase our purchase while leaving the obstruction unresolved
@JamieAllen0295 Yes, I made that sound more certain than it's. Compare candidate geometry in the measured layout; a larger arm is only useful if the complete approach improves.
@ElliotBrown0944 We had a different machine application where a good transfer layout put the pedestal across a service panel. Maintenance spotted the catch immediately.
@AdaCarter0999 A removable base adds relocation and installation checks to the work. Have the integrator weigh that against keeping normal service access clear in the layout.