I'm planning an FR10 bracket job from old records. They show acceptable alignment in the fixture, failed dimensions after release and a correction step with no duration. The proposed cycle time leaves that work out.
The welding lead remembers a separate bench operation, but not whether every bracket needed it. We're looking for the travellers rather than assuming it was routine.
Keep the before and after readings together if you find them. We lost sample links by renaming folders, and suddenly a very tidy record said very little.
Found individual IDs on final inspection, but the correction note is batch-level. I can't attach a duration or correction to every item from what we have.
The proposal now includes a process review before committing to the cycle figure. We still need to establish why the released brackets failed and what the bench work changed.