Our polymer-blank proposal reaches the fixture. The FR5 stand also fills the setter's space. No complete tool shown yet. I need a comparison we can actually hand over.

17 replies

OS
OscarBell0619
Replying to HazelAbbott0049

Has the setter marked the space needed for a fixture change?

2 points
NO
NoraAli0235
Replying to HazelAbbott0049

Reach seems a small victory if nobody can set the machine.

20 points
SO
SofiaBrooks0804
Replying to OscarBell0619

We inspected a bay where the routine loading gap looked generous, but the fixture needed a trolley straight in from the front. The people selling the layout had only watched someone load one part. Get the setter's actual changeover into this comparison.

17 points
LE
LeahChan1104
Replying to SofiaBrooks0804

Sofia, that is also where I'd involve whoever covers the setter. Our laboratory layouts used to rely on one person knowing which loose items could be moved, until the covering person quite reasonably left them where the drawing put them.

15 points
HA
HazelAbbott0049
Replying to OscarBell0619

Setter marked it with the fixture trolley included. The proposed stand overlaps that space.

7 points
DA
DanielBrooks0826
Replying to HazelAbbott0049

Ask the supplier to price a workable alternative, including the complete tool and open door, before retaining this stand position as the cheap option

4 points
KA
KarenBriggs
Replying to DanielBrooks0826

I'd keep manual tending in the comparison too. Not as a punishment for a bad drawing, just because a supervised small-batch job may lose its advantage once every fixture change needs a separate moving-and-checking task.

12 points
CH
ChloeAli0222
Replying to KarenBriggs

Moving the stand might be a valid design option, Karen, but the proposal has not introduced that yet. Or rather, we don't know whether this stand is meant to move at all

13 points
KA
KarenBriggs
Replying to ChloeAli0222

Yes, conditional. I meant if that is their proposed cure. I wouldn't add a movable stand to Hazel's requirements myself.

8 points
HA
HazelAbbott0049
Replying to KarenBriggs

They proposed a movable base. Our lab lead won't accept a new relocation task for this job.

6 points
NO
NoraAli0235
Replying to HazelAbbott0049

Then that alternative is out. Any fixed position left?

3 points
SO
SofiaBrooks0804
Replying to HazelAbbott0049

Hazel, has the supplier seen the actual open door, not just the opening in the machine brochure? A further fixed position still needs the tool's whole approach and withdrawal checked.

17 points
HA
HazelAbbott0049
Replying to SofiaBrooks0804

Nora, one side position remains. Sofia, they now have the measured door and handle with the full tool.

9 points
CH
ChloeAli0222
Replying to HazelAbbott0049

And the receiver location? Removing a blank from the fixture is only part of the route. I can't tell where you intend to put it down

8 points
HA
HazelAbbott0049
Replying to ChloeAli0222

Receiver is on the fixed bench. Side position blocks its manual loading aisle. Lab lead rejected that too.

5 points
DA
DanielBrooks0826
Replying to HazelAbbott0049

Did you decide to retain manual tending, or is another bay now part of the proposal?

8 points
HA
HazelAbbott0049
Replying to DanielBrooks0826

Manual tending stays. We closed this purchase proposal; another bay is not available. Thanks, Karen. Keeping the existing job in the comparison made the decision much easier to explain.

-1 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.