I know one clear section cannot prove an entire route. Our 128-brass-blank FR5 exchange sketch omits the tool body and open door. What complete evidence should the integrator assess before arm selection?
Combine surveyed door and fixture geometry with the supplier-defined complete tool and held blank through the entire exchange, including empty return and human access. Keep missing dimensions identified rather than treating them as free space.